Contact us today!
Let us help you find the right solution.
In the media
IPS two-ram bale ties
IPS two-ram bale-tie balers bale and tie simultaneously. They deliver maximum through-put and bale density for a variety of materials.
- Materials baled: fibre, plastic, OCC, ferrous and non-ferrous.
Specifications
IPS TR-1388 BT 200 |
IPS TR-1388 BT 100 |
||
Electrical: |
Total force |
424,530 lbs (193 metric tons) |
424,530 lbs (193 metric tons) |
Ram face pressure |
253 PSI (17.4 bar) |
253 PSI (17.4 bar) |
|
System pressure |
3,200 PSI (220 bar) |
3,200 PSI (220 bar) |
|
Main cylinder |
13” bore (330 mm) |
13” bore (330 mm) |
|
Bale door cylinder |
8” bore (203 mm) |
8” bore (203 mm) |
|
Ejector cylinder |
10” bore (254 mm) |
9” bore (229 mm) |
|
Pre-compression lidTM cylinder (optional) |
8” bore (203 mm) |
8” bore (203 mm) |
|
Strapper |
L&P or Accent Wire-Tie system |
L&P or Accent Wire-Tie system |
|
Electrical: |
Motors (2) |
100 HP (75 kW) |
100 HP (75 kW) |
Strapper pump motor |
15 HP (11.2 kW) |
10 HP (7.5 kW) |
|
Controls |
Programmable controller with phone modem |
Programmable controller with phone modem |
|
Structure: |
Length |
38’ (11.6 m) |
38’ (11.6 m) |
Width |
26’ (7.9 m) |
26’ (7.9 m) |
|
Charge hopper height |
90“ (2.3 m) |
90“ (2.3 m) |
|
Hopper opening |
72“ W by 96” L (1.829 m W by 2.438 m L) |
72“ W by 96” L (1.829 m W by 2.438 m L) |
|
Performance: |
Bale size |
45” W by 30” H by 62 to 64” L |
45” W by 30” H by 62 to 64” L |
Bale volume |
50 cubic feet expanded |
50 cubic feet expanded (approximately) |
|
Dry cycle time |
17 seconds (no load with lid) |
32 seconds (no load with lid) |
|
Estimated bale weights: |
OCC |
Up to 1,600 lbs |
Up to 1,600 lbs |
Newspaper |
Up to 1,700 lbs |
Up to 1,700 lbs |
|
PET |
Up to 1,350 lbs |
Up to 1,350 lbs |
|
UBC |
Up to 1,200 lbs |
Up to 1,200 lbs |
|
Solid waste |
Up to 2,500 lbs |
Up to 2,500 lbs |
|
Estimated tons per hour: |
OCC |
Up to 27 tons per hour |
Up to 20 tons per hour |
Newspaper |
Up to 38 tons per hour |
Up to 30 tons per hour |
|
PET |
Up to 10 tons per hour |
Up to 8 tons per hour |
|
UBC |
Up to 18 tons per hour |
Up to 15 tons per hour |
|
Solid waste |
Up to 48 tons per hour |
Up to 36 tons per hour |

